Overview

Prolyte
ST-Tower

Send booking request

The ST tower is based on S40T mast sections. These mast sections have one-sided horizontal bracing to facilitate safe and easy climbing of the towers, with the use of an appropriate fall protection system. The ST tower uses several sleeve blocks that combine all the trusses from the S and B Series. This makes it possible to fit any of the S Series trusses to all four sides by means of bolted female CCS7 couplers. The ST tower has a self-weight of 120 kg. The ST sleeve block is a fully bolted structural element, making it much stronger and more precise than conventional welded versions. The ST tower is a cost-effective investment. You need only purchase the special parts if you wish to expand your truss system with towers. 

There is a structural relation between tower length and size. Additionally, the applied load and the method of restraining the tower base also contribute to determination of the total loading capacity. All these factors must be taken into consideration when determining the allowable load and tower length. 

Technical data

Weight 120 kg
Max. Load 2000 kg

Book product

We look forward to your inquiry!

Questions?
Call us.

+49 751 - 977144-60
There was an error sending your request, please try again later or contact us directly below info@jaeger-group.net Thank you! Your request has been sent successfully!